Skip to main content

Environmental Nonconformance Management

The nonconformance report (NCR / 缺失表) is LaParty's standard tool for documenting environmental and operational deficiencies found during factory site inspections — both at Taiwan supplier factories and the Vietnam production facility. After each inspection, a completed Excel spreadsheet is sent to the factory with numbered items, descriptions, expected correction dates, and requirements for before/after photos.


Report Format

ColumnDescription
NO.Sequential item number
DeficiencySpecific issue description (location + problem)
Expected Correction DateFactory fills in planned completion date
Post-Correction PhotoFactory must provide photographic evidence of fix
Discussion Result (some factories)On-site resolution discussion, responsible party

Factory Inspection Records

Sheng Yin Factory (2022-06-24)

June 24, 2022 inspection — 50 nonconformances recorded across 1F and 2F production areas:

Sanitation & Pest Control

  • Damp cloth left unsorted near 1F entry sink; hand dryer not plugged in
  • Kitchen walls have cobwebs; no mosquito trap lamps or mouse traps in place
  • No mouse traps anywhere around the factory perimeter
  • Film blowing area: mosquito trap lamps partially unpowered; no mouse traps
  • Dirty and cluttered area between film blow machines #24 and #25

Material & Aisle Management

  • Film rolls beside machine #1 blocking fire exit corridor
  • All resin pellets stored without pallets; pellets exposed without cover
  • All resin pellet buckets without lids
  • Bagged pellets, ink drums, and collection rolls left in walkways
  • 2F: roll materials stored near elevator; pallets scattered without marking

Equipment

  • Machines E-07 through E-14: products, toolboxes, cups, boards, and iron rods left on machines
  • Machine #17 (chain machine): tools, gloves, and cloth left on top
  • Between machines E-19 and E-20: products, cardboard, and waste in aisle
  • Material mixing machine dirty and contaminated
  • Film blow machines dusty; windows dirty with insect debris

Facilities & Safety

  • 1F restroom: no emergency eyewash station; no hand dryer
  • Film blow area weighing table: box cutters (non-safety type) in drawer
  • Mold on walls near 2F–3F office stairwell
  • 1F workshop: window screens damaged or missing
  • Windbreak curtains near film blow machines dirty; paint peeling from walls

Nian Feng Factory (2022-06-24)

June 24, 2022 inspection, focusing on food-safety compliance and material handling:

Finished Goods & Raw Materials

  • Finished goods not covered (resolved: palletized and shrink-wrapped)
  • Resin bags not covered or placed on pallets
  • Paper tubes stored directly on the floor

Facility Condition

  • Ceiling mold — requires cleaning and treatment
  • Ceiling paint peeling (factory's responsibility)
  • Tool boxes left on the floor; must be returned to storage after use
  • Missing lamp covers — confirmed to be LED lamps

Pest Control

  • Mosquito trap lamps need numbering system (confirmed counts: 1F×18, 2F×10, 3F×12)
  • Cleaning log records to be created; regular cleaning schedule required

Personnel & Hygiene

  • Workers in rear production area not wearing hair nets
  • Doors must remain closed at all times
  • Plastic strip curtains have gaps; additional strips required
  • Dark spots on walls/floors require cleaning

Xiao Xie Factory (2022-06-27)

June 27, 2022 inspection. Uses before/after photo format plus on-site discussion notes:

NO.NonconformanceDiscussion Outcome
1Damage to acrylic panels (doors, windows, machine panels)Investigate acrylic suppliers
2No safety knives; workers using paper cutters insteadSource proper safety knives; blade extension length matters
3Paint peeling within 50cm safety lines; storage area walls also peelingFull factory repaint; schedule to be determined
4Epoxy floor cracked in sanitation area and finished goods warehouseDifficult to repair; green cement considered; pending Xie General's input
5Hot weather; doors can't stay closed; workers bring cardboard into packing areaExplore heat dissipation solutions; landlord approval needed for installation
6Anti-heat aluminum foil on ceiling has fallen; repair request unansweredScaffolding required; machines block access; pending Xie General's input
7Holes in roofGlass sealant applied; monitor during water-spray testing
8All sinks: no hot water; most sinks leakHot water adjustable via tap; leaks can be fixed in-house
9No emergency eyewash station in factoryPending completion date from team
10Raw materials stored within 50cm safety zone near film machinesPartially improved; flat-mouth machine space remains an issue
11Copper tubes not on shelving racks; ends not sealed with adhesive labelsAssign labeling task (completed 2022-07-15)
12Mixing drum needs stainless steel lidSeal bottom holes with mesh or iron net; method TBD
13Cobwebs in wall cornersWeekly cleaning rotation established (completed 2022-07-05)
14Water dispenser placed near restroom — food safety violationKEN searching for appropriate placement

Vietnam Factory Nonconformances (2026)

Vietnam factory nonconformance records for 2026 are tracked in 越南缺失表.xlsx. A presentation documenting corrective actions from a January 14, 2026 site walk (260114 現場巡場缺失更正.pptx) was prepared for the same period, showing photographic before/after evidence of completed corrections.


Deficiency Tracking Process

  1. Site inspection conducted; nonconformances photographed and documented
  2. Excel NCR sheet issued to factory
  3. Factory fills in expected correction dates and returns the sheet
  4. LaParty reviews post-correction photos for each item
  5. Outstanding items from prior visits are added to the next inspection's re-check list

Source Files

  • ~/OneDrive/6-各廠商環境缺失/ — Taiwan supplier factory NCR sheets by factory
  • ~/OneDrive/越南缺失(2026)/ — Vietnam factory NCR records, 2026